WordPress.org

Support

Support » How-To and Troubleshooting » upgrade to .72 calendar problems

upgrade to .72 calendar problems

Viewing 2 replies - 1 through 2 (of 2 total)
  • here is line 148:
    if ($wpdb->num_rows > 0) {
    $daysinmonthwithposts = ‘-‘;
    foreach ($arc_results as $arc_row) { (148)
    $daysinmonthwithposts .= $arc_row->dom.’-‘;
    }
    $calendarmonthwithpost = 1;
    } elseif ($calendar != ”) {
    $daysinmonthwithposts = ”;
    $calendarmonthwithpost = 1;
    } else {
    $thismonth = zeroise(intval($thismonth)-1,2);
    if ($thismonth == ’00’) {
    $thismonth = ’12’;
    $thisyear = ”.(intval($thisyear)-1);
    }
    }
    i have repaired the tables and optimised them as well

    ok, now my site is not showing the comments, or a few of the other php includes
    i have upgraded from .71 to .72 today

Viewing 2 replies - 1 through 2 (of 2 total)
  • The topic ‘upgrade to .72 calendar problems’ is closed to new replies.
Skip to toolbar