Support » Plugin: Q2W3 Post Order » [Plugin: Q2W3 Post Order] change order of multi-lnguage

  • Hi,

    I publish posts in double language with qTranslate. I tried to change the posts position but only the English version was changed, while the Italian was unchanged.
    I also have another problem: the first post was published two times: as feature and as excerpt. I like to have it published only as a feature.

    Cheers

    Stefano

    http://wordpress.org/extend/plugins/q2w3-post-order/

Viewing 5 replies - 1 through 5 (of 5 total)
  • Plugin Author Max Bond

    (@max-bond)

    Hello!
    Need to see how thing are working on your site.

    I tested qTranslate with Q2W3 Post Order on my default test site and didn’t find any problems… I tested with the default theme – Twenty Eleven. Can you change theme for a bit of testing?

    I am using bombax theme. Actually, Q2W3 Post Order divides each of my multi-labhuage posts in two distinct posts , one per language( English and Italian). So I need to manually change the position of each post two times: once for the English version and once for the Italian version of my blog. It’s a bit tricky. Is it the way it should be or normally one can change a multi-language-post position in one click?

    Plugin Author Max Bond

    (@max-bond)

    What version of qTranslate you are using??
    I tried the latest – 2.5.24.
    And as I can see it stores different post versions in one db entry, so you need to change post order only once.
    qTranslate ver 1.x is different, may be it’s your version?

    Yes, I have the latest version you mentioned. Are you sure I don;t need to I installqTranslate extension?
    By the way, is there a way to set the posts order back to the original chronological listing?

    Plugin Author Max Bond

    (@max-bond)

    Latest version of qTranslate… Hm…
    I cannot understand how one post devided in two… )

    By the way, is there a way to set the posts order back to the original chronological listing?

    Enter position 0 – post will return to un-sorted list

Viewing 5 replies - 1 through 5 (of 5 total)
  • The topic ‘[Plugin: Q2W3 Post Order] change order of multi-lnguage’ is closed to new replies.