Support » Plugins and Hacks » [Plugin: postMash] Any way to quickly change order within long list of Posts?

  • I am sure this must be staring me in the face…
    I have a long long lists of posts (say 250), which cover a few different “sections” of my site (say each section has like 25 posts).
    When I add a new post I would like to quickly be able to drag it down to the grouping of other posts from the same section – I think I just click and drag the post down on the postMash as far as I can, scroll down, repeat.
    Is there any faster way to do this?
    Likewise, if I need to move a lot of posts (say 20-25) at the same time to lower in the postMash order?
    Great plugin and does just what I need…just trying to figure out if I could be doing things faster 🙂
    Thanks all!

  • The topic ‘[Plugin: postMash] Any way to quickly change order within long list of Posts?’ is closed to new replies.