[Plugin: Organize Series] Scheduled or Draft Posts Influence Number Sequence
-
Love the plugin, but when I schedule or draft a post to be a part of a series, it influences the number sequence on the front-facing site. So if I was scheduling a post to become post #3, the fifth article would read: Post 6 of 5. The only option, it seems is to set the series components after publication – or simultaneously with publication — however there are many instances where scheduling a post is desirable. Any ideas how to resolve?
Viewing 2 replies - 1 through 2 (of 2 total)
Viewing 2 replies - 1 through 2 (of 2 total)
- The topic ‘[Plugin: Organize Series] Scheduled or Draft Posts Influence Number Sequence’ is closed to new replies.