Support » Plugin: Magic Fields » [Plugin: Magic Fields] Cannot change order of images in wp gallery

  • Resolved dariodev

    (@dariodev)


    After upgrading to version Magic Fields 1.4.5, I cannot change order of images in gallery. I have tried to disable all other plugins to make sure there is no interfere of some other plugin, but the problem remains. After downgrade to version 1.4.1 everything is OK. The same problem is in all of my WordPress 3.0.1 sites (don’t know about older versions of wp).

    http://wordpress.org/extend/plugins/magic-fields/

Viewing 4 replies - 1 through 4 (of 4 total)
Viewing 4 replies - 1 through 4 (of 4 total)
  • The topic ‘[Plugin: Magic Fields] Cannot change order of images in wp gallery’ is closed to new replies.