Support » Plugin: NextGEN Gallery - WordPress Gallery Plugin » How to change order of slideshow images?

  • Sandy

    (@sandylilogiccoza)


    Hi,

    I’ve got a website where I use NextGEN plugin for the gallery. I want to know how to change the order of the slideshow images, like the latest uploaded image should be displayed first and the old image to display last. Is there any way to do this, like is there any settings in the back-end or do I have to change code.

    Urgent help needed please.

    Thanks in advance.

    http://wordpress.org/plugins/nextgen-gallery/

Viewing 3 replies - 1 through 3 (of 3 total)
  • Plugin Author photocrati

    (@photocrati)

    @sandyl@ilogic.co.za – Our next (beta) release is scheduled to include many fixes and improvements to the sorting options already in place.

    You should be able to choose from many options in the Sort / Exclude panel of the ATP when you insert a new Slideshow.

    – Cais.

    Sandy

    (@sandylilogiccoza)

    Ok, thank you.

    But is there no way I can do what I want to do without updating the plugin? The version I’m using is v2.0.31.

    Plugin Author photocrati

    (@photocrati)

    @sandyl@ilogic.co.za – Unfortunately, no. That sorting functionality will be in the next (beta) release) of NextGEN Gallery.

    – Cais.

Viewing 3 replies - 1 through 3 (of 3 total)
  • The topic ‘How to change order of slideshow images?’ is closed to new replies.