Support » Plugin: T&P Gallery Slider » Change order of pictures

Viewing 6 replies - 1 through 6 (of 6 total)
  • Plugin Author pey22

    (@pey22)

    Hello rachelcjstuf.
    yes you can change the order of the images.
    in wordpress 3.5 inside gallery, click and drag photos to re-order them as you like.

    Hi i ma having an issue with the gallery when i post the page it shows the images outside the gallery also im wondering why is this happening ,

    Well done on the gallery is is very responsive and im looking forward to using it more when i figure out how to get it going properly

    Plugin Author pey22

    (@pey22)

    Hell wanderwithme
    can you please send me link to your site? (the gallery page).
    i don’t know exactly what do you mean or screen shot.

    Hi thanks for the response and sorry i was not clear in the post, What was happening is when i inserted say 3 images in a post using the standard insert from media library in word press i end up with the gallery and also the images posted outside the gallery http://markcoughlanphotography.com/2013/01/13/425/ but i just needed to insert the images then delete the code after and it did the trick,

    Thanks again

    Plugin Author pey22

    (@pey22)

    Hello wanderwithme
    i am glad you success, i looked your link, you need to set the height to
    356px and then it will be perfect!
    now the gallery height is 500px so you have space between the big image to his description.

    Dear Wanderwithme
    Greetings
    I did visit the link and did like what you have achieved. I am very much interested in your solution.
    Will you please detail the process?
    Did you delete the short code [tp_gallery]?
    Please help
    Thanks in advance.
    psinghp@eim.ae

Viewing 6 replies - 1 through 6 (of 6 total)
  • The topic ‘Change order of pictures’ is closed to new replies.