Can’t change order of product categories
-
Hi, My product category list has 2 items which are a parent.(Rain harvest systems and Tanks) The rest of the product categories are sub categories i think and have “none” as their parent category.
I needed “Rain harvest systems” at the top of list which you click on and get sub categories of sub categories of “below ground tanks” etc. Then under that I needed stand alone categories like “connectors and fittings”, “control units” etc
I used the drag and drop facility and changed the order but it doesn’t reflect on the website. What am I doing wrong? Thanks
The page I need help with: [log in to see the link]
Viewing 3 replies - 1 through 3 (of 3 total)
Viewing 3 replies - 1 through 3 (of 3 total)
- The topic ‘Can’t change order of product categories’ is closed to new replies.